to i ・ Dレター ・ Hownstallタフライトサインクリスタルレター取付方法 Our Taff Lite sign and D-Letter and Crystal Letter products are delivered with an enclosed installation template created on regular paper. We can also provide a special plastic template (sold separately) upon request.TemplateFix the height where the horizontal line of the template to be placed. Mark it on the wall and stick masking tape horizontally.NoteABS Letter SignClean the surface of the wall where the letters will be installed, using a degreasing agent to remove any oils.Mark the center on the masking tape.266Installing Taff Lite sign and D-Letter and Crystal Letter with the double-sided adhesive tape requires mounting on a flat surface without any irregularities. Please be aware that an accident may occur, or the adhesive may fail, if used on irregular surfaces such as concrete, coated surfaces, etc. Please thoroughly read the installation manual before installation. We cannot be held respon-sible for any accidents or failures due to improper installation.CenterHorizontal Line*The Vertical and Horizontal Lines are placed in the Center of the template.*As shown above, the horizontal and vertical lines are already drawn on the template.CenterVertical Line*Oil and grime may weaken the adhesion of the tape. Also, be sure that the surface is completely dry.*Please note that depending on the material and finish the degreaser may damage the wall surface.Scan the QR code for Website.WebカタログはQRコードを読み取ってください。How to install Taff Lite Sign & D-Letter & CRYSTAL LETTERタフライトサイン ・ Dレター ・ クリスタルレター 取付方法020103
元のページ ../index.html#266